Project | Panigaglia Vessel Reloading |
---|---|
Business Area | Cable Tray Systems |
Client | Sa.Gest. S.r.l. |
End user | Snam Rete Gas / GNL Italia |
Site | GNL Italia S.p.A. |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 150.000€ |
Project | Rotterdam Capacity Growth |
---|---|
Business Area | Oil & Gas – Industrial |
Client | NESTE |
End user | NESTE |
Site | Neste Netherlands B.V. |
Progress | In progress |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 130.000 |
Manpower Peak | 90 |
Amount | > 10.800.000 € |
Project | Maboqueiro Platform |
---|---|
Business Area | Cable Tray Systems |
Client | Gruppo Antonini S.p.A. |
End user | Azule Energy |
Site | Gruppo Antonini |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 200.000 € |
Project | Maboqueiro Platform |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Gruppo Antonini S.p.A. |
End user | Azule Energy |
Site | Gruppo Antonini |
Progress | In progress |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 25.000 |
Manpower Peak | 30 |
Amount | > 1.000.000 € |
Project | FSRU Piombino |
---|---|
Business Area | Cable Tray Systems |
Client | Novello S.r.l. |
End user | SNAM FSRU Italia S.r.l. |
Site | Golar Tundra Rigassificatore |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 400.000 € |
Project | Condensation Unit Enefit Power |
---|---|
Business Area | Cable Tray Systems |
Client | Siirtec Nigi S.p.A. |
End user | Enefit Power AS |
Site | Narva, Estonia |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 305.000 € |
Project | NESTE Site Development Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Impes Service / Technip |
End user | NESTE |
Site | Neste Netherlands B.V. |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 50.000 |
Manpower Peak | 50 |
Amount | > 2.230.000 € |
Project | Argo-Cassiopea Project |
---|---|
Business Area | Cable Tray Systems |
Client | Rema Tarlazzi S.p.A. |
End user | Eni S.p.A. |
Site | ENIMED Gela |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 250.000 € |
Project | Peakers Project Enipower Ravenna |
---|---|
Business Area | Cable Tray Systems |
Client | Arkad S.p.A. |
End user | Enipower Ravenna |
Site | Ravenna |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 310.000 € |
Project | New HDG Line & Color Coating Line |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Danieli |
End user | Arvedi |
Site | Servola , Trieste |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 45.000 |
Manpower Peak | 50 |
Amount | > 1.350.000 € |
Project | Ettore Majorana |
---|---|
Business Area | Cable Tray Systems |
Client | SOMI S.r.l. |
End user | ENEL |
Site | Termini Imerese, Palermo |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 198.000 € |
Project | Orion Engineered Carbons |
---|---|
Business Area | Cable Tray Systems |
Client | SIE S.r.l. |
End user | Orion Engineered Carbons S.r.l. |
Site | Orion Engineered Carbons (Ravenna) |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 237.000 € |
Project | Tunnel Frejus |
---|---|
Business Area | Cable Tray Systems |
Client | NIDEC ASI S.A. |
End user | SFTRF |
Site | Tunnel Frejus |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 255.000 € |
Project | Tempa Rossa |
---|---|
Business Area | Cable Tray Systems |
Client | Lux Impianti S.r.l. |
End user | ENI S.p.A. |
Site | Centro Oli Tempa Rossa (Val d'Agri) |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 120.000 € |
Project | Genesis Biotech Expansion Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Wood |
End user | Teva |
Site | Teva Ulm Germany |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 300.000 |
Manpower Peak | 150 |
Amount | > 14.000.000 € |
Project | New Platform Tolmount Deck |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Rosetti Marino S.p.A. |
End user | Premier Oil |
Site | Rosetti Marino Spa - Cantiere Piomboni |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 50.000 |
Manpower Peak | 100 |
Amount | > 2.000.000 € |
Project | Porvoo Turnaround 2020 |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Neste Oil |
End user | Neste Oil |
Site | Porvoo, Finland |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 16.000 |
Manpower Peak | 50 |
Amount | > 500.000 € |
Project | Revamping Hot Strip Mill Plant |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Danieli |
End user | Tata Steel |
Site | Ijmuiden, The Netherlands |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 60.000 |
Manpower Peak | 60 |
Amount | > 2.560.000 € |
Project | Sarroch Refinery |
---|---|
Business Area | Cable Tray Systems |
Client | SIE S.r.l. |
End user | Saras S.p.A. |
Site | Saras S.p.A. (Sarroch) |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 264.000 € |
Project | Zürich Airport |
---|---|
Business Area | Cable Tray Systems |
Client | Moditech S.r.l. |
End user | Flughafen Zürich |
Site | Flughafen Zürich |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 54.000 € |
Project | Chemicals plants |
---|---|
Business Area | Cable Tray Systems |
Client | Desmet Ballestra S.p.A. |
End user | Manufacturers of: detergents, surfactants and chemicals |
Site | Desmet Ballestra |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 370.000 € |
Project | New Logistic Site |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Solesi |
End user | ENEL |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations Automation, Telecom & Communication System Cyber Security |
Man-hours | 30.000 |
Manpower Peak | 40 |
Amount | > 1.400.000 € |
Project | B'er Tuvia Power Station - Israel |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Siemens |
End user | Siemens |
Site | Be'er Tuvia, Israel |
Progress | Completed |
Activity |
HVAC |
Man-hours | 20.000 |
Manpower Peak | 50 |
Amount | > 1.300.000 € |
Project | Amur Gas Processing Plant |
---|---|
Business Area | Cable Tray Systems |
Client | Tecnimont S.p.A. |
End user | Gazprom |
Site | Amur Gas Processing Plant |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 2.970.000 € |
Project | CORU (Moscow Refinery) |
---|---|
Business Area | Cable Tray Systems |
Client | Tecnimont Russia |
End user | Gazprom |
Site | Газпромнефть – Московский НПЗ Kapotnya 2-Y Kvartal, 1, корп. 3 Moscow Russia |
Progress | Completed |
Activity |
Cable support system production |
Amount | > 2.450.000 € |
Project | Yara Bamboo Project - SS1Q |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECNICAS REUNIDAS |
End user | YARA |
Site | Porsgrunn, Norway |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 100.000 |
Manpower Peak | 150 |
Amount | > 5.500.000 € |
Project | Urea Granulation 8 Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECNIMONT |
End user | YARA |
Site | Sluiskil, The Netherland |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations HVAC |
Man-hours | 160.000 |
Manpower Peak | 100 |
Amount | > 10.000.000 € |
Project | Yara Syra 4 Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | CASALE |
End user | YARA |
Site | Koping, Sweden |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 160.000 |
Manpower Peak | 250 |
Amount | > 14.000.000 € |
Project | EFRA Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | KINETICS TECHNOLOGY |
End user | LOTOS ASFALT |
Site | Gdansk, Poland |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 450.000 |
Manpower Peak | 260 |
Amount | > 10.000.000 € |
Project | New Chemical Plant EPDM-GP27 |
---|---|
Business Area | Oil & Gas – Industrial |
Client | SAIPEM |
End user | VERSALIS |
Site | Ferrara, Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 100.000 |
Manpower Peak | 100 |
Amount | > 7.200.000 € |
Project | New Platform "Clara NW" |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Navalmare |
End user | ENI E&P |
Site | Cantieri Navali La Spezia |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 15.000 |
Manpower Peak | 110 |
Amount | >1.100.000 € |
Project | Project Modules “ZADCO UZ 750 – EPPC Works for Islands Surface Facilities (EPC 2)” |
---|---|
Business Area | Oil & Gas – Industrial |
Client | OMA GROUP |
End user | General Electric - Nuovo Pignone |
Site | Avenza (MS) |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 200.000 |
Manpower Peak | 180 |
Amount | 5.000.000 € |
Project | New Platform "Litchendjili" |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Navalmare |
End user | ENI Congo |
Site | Cantieri Navali La Spezia |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 50.000 |
Manpower Peak | 110 |
Amount | >3.900.000 |
Project | Heavy Residue Process Complex |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECHNIP ITALY S.p.A. |
End user | LUKOIL |
Site | Bourgas, Bulgaria |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 930.000 |
Manpower Peak | 680 |
Amount | > 17.500.000 € |
Project | Hydrogen & Hydroconversion Plant |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Technip KTI |
End user | Iplom S.p.A. |
Site | Busalla (GE) |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 152.000 |
Manpower Peak | 100 |
Amount | 3.500.000 € |
Project | MO.S.E. |
---|---|
Business Area | Cable Tray Systems |
Client | Ing. E. Mantovani S.p.A. |
End user | Consorzio Venezia Nuova |
Site | Venezia, Italy |
Progress | Completed |
Activity |
Cable support system production |
Amount | 1.100.000 € |
Project | PTA 2/3 Expansion Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECHNIP ITALY S.p.A. |
End user | BP CHEMBEL NV |
Site | Geel, Belgium |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations Control Room DCS SIS |
Man-hours | 117.000 |
Manpower Peak | 60 |
Amount | > 5.500.000 € |
Project | C4 Isomerization Debottlenecking |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECHINT |
End user | LYONDELLBASELL |
Site | Rotterdam, The Netherlands |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 45.000 |
Manpower Peak | 120 |
Amount | > 2.500.000 € |
Project | New SR3 & TG1 Plant |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECNIMONT KT |
End user | NYNAS |
Site | Nynashamn, Sweden |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 150.000 |
Manpower Peak | 150 |
Amount | > 5.500.000 € |
Project | LNG Receiving Terminal |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TS LNG |
End user | GATE |
Site | Rotterdam, The Netherlands |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 320.000 |
Manpower Peak | 290 |
Amount | > 10.000.000 € |
Project | New Gas Compression Station |
---|---|
Business Area | Oil & Gas – Industrial |
Client | RENCO |
End user | FLUXIS |
Site | BERNEAU, WEELDE, ZELZATE (BELGIUM) |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 165.000 |
Manpower Peak | 120 |
Amount | > 5.500.000 € |
Project | New Lng Terminal |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TS LNG |
End user | Dunkerque LNG |
Site | Dunkerque, France |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 680.000 |
Manpower Peak | 400 |
Amount | > 27.000.000 € |
Project | New Lng Terminal |
---|---|
Business Area | Oil & Gas – Industrial |
Client | JV SAIPEM - TECHINT - PBG |
End user | POLSKIE LNG SA |
Site | Swinoujscie - Poland |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 1.080.000 |
Manpower Peak | 350 |
Amount | > 15.500.000 € |
Project | Energy from Waste Facilities |
---|---|
Business Area | Oil & Gas – Industrial |
Client | CNIM |
End user | CLUGSTON |
Site | Oxford, UK |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 150.000 |
Manpower Peak | 150 |
Amount | > 4.500.000 € |
Project | ELEFSIS Refinery Update Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECNICAS REUNIDAS |
End user | HELPE HELLENIC PETROLEUM |
Site | Elefsina, Greece |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 500.000 |
Manpower Peak | 300 |
Amount | > 13.000.000 € |
Project | New Gas Treatment Plant |
---|---|
Business Area | Oil & Gas – Industrial |
Client | ENI S.p.A. |
End user | ENI S.p.A. |
Site | Capparuccia, Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations EPC Contracting |
Man-hours | 55.000 |
Manpower Peak | 80 |
Amount | > 5.000.000 € |
Project | HALFDAN BC - Accommodation Top Side |
---|---|
Business Area | Oil & Gas – Industrial |
Client | ROSETTI MARINO S.p.A. |
End user | MAERSK OLIE OG GAS AS |
Site | Marina di Ravenna , Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 115.000 |
Manpower Peak | 130 |
Amount | > 3.500.000 € |
Project | Tout Lui Faut Refinery Expansion |
---|---|
Business Area | Oil & Gas – Industrial |
Client | SAIPEM S.p.A. |
End user | STAATSOLIE |
Site | Paramaribo, Suriname |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 950.000 |
Manpower Peak | 500 |
Amount | > 8.000.000 € |
Project | Horizon Oil Sand Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECHNIP ITALY S.p.A. |
End user | CNRL - Canada Horizon Oil Sands Project Upgrading |
Site | Alberta, Canada |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 3.250.000 |
Manpower Peak | 600 |
Amount | > 97.000.000 € |
Project | Resource Recovery Plant Waste to Energy |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Foster Wheeler Italiana S.p.A. |
End user | Lomellina Energia S.r.l. |
Site | Parona (PV), Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 50.000 |
Manpower Peak | 80 |
Amount | > 2.000.000 € |
Project | Power Plant |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Foster Wheeler Italiana S.p.A. |
End user | Voghera Energia S.r.l. |
Site | Torremenapace (PV), Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 90.000 |
Manpower Peak | 100 |
Amount | > 3.000.000 € |
Project | Combined Heat and Power Plant 1.200 MW |
---|---|
Business Area | Oil & Gas – Industrial |
Client | ENIPOWER S.p.A |
End user | SNAMPROGETTI S.p.A. |
Site | Ferrera Erbognone (PV), Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 250.000 |
Manpower Peak | 200 |
Amount | > 8.000.000 € |
Project | Combined Heat and Power Plant 800 MW |
---|---|
Business Area | Oil & Gas – Industrial |
Client | ENIPOWER S.p.A. |
End user | SNAMPROGETTI S.p.A. |
Site | Ferrara, Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 100.000 |
Manpower Peak | 150 |
Amount | > 6.000.000 € |
Project | Combined Heat and Power Plant 800 MW |
---|---|
Business Area | Oil & Gas – Industrial |
Client | ENIPOWER S.p.A. |
End user | SNAMPROGETTI S.p.A. |
Site | Mantova, Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 200.000 |
Manpower Peak | 180 |
Amount | > 6.000.000 € |
Project | Combined Heat and Power Plant 800MW |
---|---|
Business Area | Oil & Gas – Industrial |
Client | ENIPOWER S.p.A. |
End user | SNAMPROGETTI S.p.A. |
Site | Ravenna, Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 180.000 |
Manpower Peak | 150 |
Amount | > 5.500.000 € |
Project | New Acoustic Alert System |
---|---|
Business Area | Oil & Gas – Industrial |
Client | SNAM RETE GAS - STOGIT |
End user | SNAM RETE GAS - STOGIT |
Site | Brugherio, Settala, Minerbio, Sabbioncello, Fiume Trieste, Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 100.000 |
Manpower Peak | 50 |
Amount | > 2.500.000 € |
Project | Gas Sorting Centre |
---|---|
Business Area | Oil & Gas – Industrial |
Client | STREICHER |
End user | SNAM RETE GAS |
Site | Minerbio, (BO), Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 18.000 |
Manpower Peak | 50 |
Amount | > 1.000.000 € |
Project | New Power Plant |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECNICAS REUNIDAS |
End user | NESTE-BOREALIS-VEOLIA |
Site | Porvoo, Finland |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 50.000 |
Manpower Peak | 100 |
Amount | > 4.000.000 € |
Project | TL3 MTBE BDH and KTO5 Instrument |
---|---|
Business Area | Oil & Gas – Industrial |
Client | NESTE OIL |
End user | NESTE OIL |
Site | Porvoo, Finland |
Progress | Completed |
Activity |
Instrument work for Turnaround 2018 |
Man-hours | 20.000 |
Manpower Peak | 50 |
Amount | > 1.000.000 € |
Project | Polyethylene Plant PE-3 UNIT-ISBL |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TechnipFMC |
End user | UNIPETROL |
Site | Litvinov, Czech Republic |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 250.000 |
Manpower Peak | 250 |
Amount | > 11.500.000 € |
Project | Ammonia 4 Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TechnipFMC |
End user | DUSLO |
Site | Šaľa/Nitra, Slovakia |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 250.000 |
Manpower Peak | 110 |
Amount | > 4.500.000 € |
Project | New Oil Center Completion |
---|---|
Business Area | Oil & Gas – Industrial |
Client | TECNIMONT |
End user | TOTAL E&P |
Site | Corleto Perticara (PZ), Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 30.000 |
Manpower Peak | 50 |
Amount | > 2.000.000 € |
Project | Nuclear Power Plant Boards |
---|---|
Business Area | Oil & Gas – Industrial |
Client | SIEMENS |
End user | SLOVENSKÉ ELEKTRÁRNE |
Site | Mochovce, Slovakia |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 5.000 |
Manpower Peak | 10 |
Amount | > 200.000 € |
Project | New Bioplus Project 1000 MTPY PHA Plant |
---|---|
Business Area | Oil & Gas – Industrial |
Client | BIO-ON |
End user | BIO-ON |
Site | Castel San Pietro (BO), Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 50.000 |
Manpower Peak | 100 |
Amount | > 3.000.000 € |
Project | CMP Expansion Project |
---|---|
Business Area | Oil & Gas – Industrial |
Client | Spin / Amec Foster Wheeler |
End user | Spin |
Site | Torviscosa (UD), Italy |
Progress | Completed |
Activity |
Electrical And Instrumentation Installations |
Man-hours | 40.000 |
Manpower Peak | 50 |
Amount | > 2.500.000 € |
Project | Public lighting system |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Municipality of Apricena (FG) |
End user | Municipality of Apricena (FG) |
Site | Apricena (FG), Italy |
Progress | In progress |
Man-hours | 23.000 |
Manpower Peak | 16 |
Amount | > 6.500.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Alfagomma S.p.A. |
End user | Alfagomma S.p.A. |
Site | Ferrara, Italy |
Progress | Completed |
Man-hours | 28.800 |
Manpower Peak | 40 |
Amount | > 800.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Bicomet S.p.A. |
End user | Bicomet S.p.A. |
Site | San Zeno Naviglio (BS), Italy |
Progress | Completed |
Man-hours | 9.600 |
Manpower Peak | 40 |
Amount | > 300.000 € |
Project | Heat Management - Sport Centre Cassano D'Adda (MI) |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Municipality of Cassano D'Adda (MI) |
End user | Municipality of Cassano D'Adda (MI) |
Site | Cassano d'Adda (MI), Italy |
Progress | Completed |
Man-hours | 14.400 |
Manpower Peak | 8 |
Amount | > 2.500.000 € |
Project | Heat Management - Sitie Impianti Industriali S.p.A. |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Sitie Impianti Industriali S.p.A. |
End user | Sitie Impianti Industriali S.p.A. |
Site | Ferrara, Italy |
Progress | Completed |
Man-hours | 1.920 |
Manpower Peak | 4 |
Amount | > 850.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Comer Industries S.p.A. |
End user | Comer Industries S.p.A. |
Site | Reggiolo (RE), Italy |
Progress | Completed |
Man-hours | 4.800 |
Manpower Peak | 6 |
Amount | > 450.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | E-ON Fiume Santo |
End user | E-ON Fiume Santo |
Site | Fiume Santo (SS), Italy |
Progress | Completed |
Man-hours | 57.600 |
Manpower Peak | 20 |
Amount | > 700.000 € |
Project | EXPO 2015 Russia Pavilion |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | RVS Holding |
End user | RVS Holding |
Site | EXPO Milan Russia Pavilion, Italy |
Progress | Completed |
Man-hours | 45.000 |
Manpower Peak | 75 |
Amount | > 1.450.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Italfrutta Soc. Coop. A.r.l |
End user | Italfrutta Soc. Coop. A.r.l |
Site | Fiesso Umbertiano (RO), Italy |
Progress | Completed |
Man-hours | 6.000 |
Manpower Peak | 30 |
Amount | > 1.500.000 € |
Project | Private Lighting System |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Sitie Impianti Industriali S.p.A. |
End user | Sitie Impianti Industriali S.p.A. |
Site | Ferrara, Italy |
Progress | Completed |
Man-hours | 1.920 |
Manpower Peak | 4 |
Amount | > 300.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | KME Group |
End user | KME Group |
Site | Florence, Italy |
Progress | Completed |
Man-hours | 43.200 |
Manpower Peak | 30 |
Amount | > 4.500.000 € |
Project | Public Lighting System |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Municipality of Noci (BA) |
End user | Municipality of Noci (BA) |
Progress | In progress |
Man-hours | 17.500 |
Manpower Peak | 12 |
Amount | > 9.500.000 € |
Project | Public Lighting System |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Municipality of Riccia (CB) |
End user | Municipality of Riccia (CB) |
Site | Riccia (CB), Italy |
Progress | In progress |
Man-hours | 3.800 |
Manpower Peak | 6 |
Amount | > 750.000 € |
Project | MEP Construction - Feed mill Sabbatani |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Sabbatani Snc |
End user | Sabbatani Snc |
Site | Forlì (FC), Italy |
Progress | Completed |
Man-hours | 14.400 |
Manpower Peak | 10 |
Amount | > 550.000 € |
Project | MEP Construction - Sprinkler Wet Fire fighting plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Snatt logistica S.p.A. |
End user | Snatt logistica S.p.A. |
Site | Funo (BO), Italy |
Progress | Completed |
Man-hours | 6.000 |
Manpower Peak | 8 |
Amount | > 300.000 € |
Project | Public Lighting System |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Municipality of Sogliano Cavour (LE) |
End user | Municipality of Sogliano Cavour (LE) |
Site | Sogliano Cavour (LE), Italy |
Progress | In progress |
Man-hours | 2.800 |
Manpower Peak | 4 |
Amount | > 3.000.000 € |
Project | Public Lighting System |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Unione Lombarda dei Comuni di Basiano e Masate (MI) |
End user | Unione Lombarda dei Comuni di Basiano e Masate (MI) |
Site | Basiano e Masate (MI), Italy |
Progress | In progress |
Man-hours | 12.000 |
Manpower Peak | 6 |
Amount | > 3.000.000 € |
Project | Public Lighting System |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Municipality of Bruino (TO) |
End user | Municipality of Bruino (TO) |
Site | Bruino (TO), Italy |
Progress | Completed |
Man-hours | 12.000 |
Manpower Peak | 4 |
Amount | > 3.500.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Elle S.r.l |
End user | Elle S.r.l |
Site | Campegine (RE), Italy |
Progress | Completed |
Man-hours | 2.000 |
Manpower Peak | 6 |
Amount | > 400.000 € |
Project | Photovoltaic Plant |
---|---|
Business Area | Energy Saving - E.S.Co. |
Client | Log Int 2 Real Estate |
End user | Log Int 2 Real Estate |
Site | Campegine (RE), Italy |
Progress | Completed |
Man-hours | 960 |
Manpower Peak | 4 |
Amount | > 150.000 € |
Project | New Railway Station High Speed Train "Mediopadana" |
---|---|
Business Area | Infrastructure |
Client | ITALFERR |
End user | CIMOLAI S.p.A. |
Site | Reggio Emilia, Italy |
Progress | Completed |
Man-hours | 120.000 |
Manpower Peak | 100 |
Amount | > 3.500.000 € |
Project | Rebuilding of a Health Care Facility |
---|---|
Business Area | Infrastructure |
Client | Villa Maria |
End user | Private Hospital for long stay patients |
Site | Padova, Italy |
Progress | Completed |
Man-hours | 100.000 |
Manpower Peak | 50 |
Amount | > 3.000.000 € |
Project | Libeskind Appartments |
---|---|
Business Area | Infrastructure |
Client | City Life |
End user | Tre Torri Contractor |
Site | Milan, Italy |
Progress | Completed |
Man-hours | 100.000 |
Manpower Peak | 100 |
Amount | > 9.000.000 € |
Project | Red Line North Underground |
---|---|
Business Area | Middle east |
Client | ISG JOINT VENTURE |
End user | QATAR RAIL |
Site | Doha, Qatar |
Progress | Completed |
Activity |
MEP Construction |
Man-hours | 750.000 |
Manpower Peak | 300 |
Amount | > 7.000.000 € |
Project | Jebel Ali Power Station M-Extension |
---|---|
Business Area | Middle east |
Client | SIEMENS-DEWA |
End user | SIEMENS-DEWA |
Site | Dubai, United Arab Emirates |
Progress | Completed |
Activity |
HVAC |
Man-hours | 100.000 |
Manpower Peak | 200 |
Amount | > 8.500.000 € |
Project | New Doha International Airport |
---|---|
Business Area | Middle east |
Client | PERMASTEELISA INTERIOR |
End user | NDIA - New Doha International Airport |
Site | Doha, Qatar |
Progress | Completed |
Man-hours | 143.000 |
Manpower Peak | 200 |
Amount | > 4.000.000 € |
Project | King Abdulaziz City for Science & Technology |
---|---|
Business Area | Middle east |
Client | ABV ROCK (KSA) |
End user | ABV ROCK (KSA) |
Site | Riyadh - Saudi Arabia |
Progress | Completed |
Man-hours | 700.000 |
Manpower Peak | 200 |
Amount | > 10.000.000 € |
Project | West Depot, Line 3 |
---|---|
Business Area | Middle east |
Client | JV SALINI IMPREGILO-LARSEN & TOUBRO-ESMA & PARTNERS |
End user | Ar Riyadh Development Authority (ADA) |
Site | Riyhad, Saudi Arabia |
Progress | Completed |
Activity |
MEP Construction |
Man-hours | 250.000 |
Manpower Peak | 250 |
Amount | > 5.000.000 € |
Project | 4 Villas Project |
---|---|
Business Area | Middle east |
Client | Bin Nasser Al Thani Real Estate |
End user | Bin Nasser Al Thani Real Estate |
Site | Doha, Qatar |
Progress | Completed |
Activity |
MEP Construction |
Man-hours | 200.000 |
Manpower Peak | 180 |
Amount | > 4.000.000 € |
We and selected third parties use cookies or similar technologies for technical purposes and, with your consent, also for other purposes as specified in the cookie policy. If you close this banner by ticking or clicking on "Decline", only technical cookies will be used. If you want to select the cookies to be installed, click on "Customize". If you prefer, you can consent to the use of all cookies, including those other than technical, by clicking on "Accept all". You can change your choice at any time.